| Author: | Rons_Place [ Dec 9th, '08, 09:14 ] |
| Post subject: | About to construct |
Hi All, I plan a 5m x 3m x 1.2m depth in ground pond (~15,000l's), the 3 metre width is governed by standard 6m width HDPE pond liner Pond liner will be around about $1000. Would it be cheaper to use reo & concrete.?? Cheers Ron |
|
| Author: | RupertofOZ [ Dec 9th, '08, 09:32 ] |
| Post subject: | Re: About to construct |
C1 could give you a definitive cost Ron... |
|
| Author: | Rons_Place [ Dec 9th, '08, 11:31 ] |
| Post subject: | Re: About to construct |
well I figure about 100mm thick would be about 3m² concrete which is about $500, then the reo on top. I wait to see what C1 says. Thanks Ron |
|
| Author: | aquaj1 [ Dec 9th, '08, 11:50 ] |
| Post subject: | Re: About to construct |
hi i helped build an inground water tank/swimming pool and it is almost full. 40,000 litres. and size is 2.8 m deep x 4.5 metres long x 4 metres wide . hand mixed it would be cheap to build. we bought concrete for the floor $600.00 plus mesh and the walls were built by hand. so i think the total cost was about $2,000.00 which includes my labour, as i got paid to do it and it took two years to complete, that was because the hole had to be dug with a pick and shovel and wheelbarrow. but i only spent about 3 hours a week on average. |
|
| Author: | Rons_Place [ Dec 9th, '08, 12:17 ] |
| Post subject: | Re: About to construct |
aquaj1 wrote: hi i helped build an inground water tank/swimming pool and it is almost full. 40,000 litres. and size is 2.8 m deep x 4.5 metres long x 4 metres wide . hand mixed it would be cheap to build. we bought concrete for the floor $600.00 plus mesh and the walls were built by hand. so i think the total cost was about $2,000.00 which includes my labour, as i got paid to do it and it took two years to complete, that was because the hole had to be dug with a pick and shovel and wheelbarrow. but i only spent about 3 hours a week on average. Thats how I'm going to have to dig the hole, nice hard clay with rocks through it, it takes about 1/2 to 1 hour to dig a hole about 1/2 metre round and 1/2 metre deep, for saplings I have been planting. |
|
| Author: | Rons_Place [ Dec 9th, '08, 12:18 ] |
| Post subject: | Re: About to construct |
I should move to Perth where the ground is sandy |
|
| Author: | creative1 [ Dec 9th, '08, 12:32 ] |
| Post subject: | Re: About to construct |
I have to read up on the thread |
|